Phase Inspection (New Construction)

Independent eyes on your new home at each key stage of construction.

Foundation forms before the concrete pour

What’s Covered

Phase inspections follow your home through construction at three key stages. Each phase is scheduled at the right stage of construction, and each phase can also be booked on its own.

Phase 1: Pre-Pour Foundation

Performed after the foundation forms are set and before the concrete is poured, while the reinforcement and below-slab work are still visible. Typical items we look at include:

Phase 2: Pre-Drywall / Framing

Performed after framing and rough-ins are complete and before insulation and drywall cover them up. Typical items we look at include:

Phase 3: Final Inspection

Performed when construction is complete and before your closing or builder walkthrough. The final inspection is identical to our full residential home inspection: the same scope and the same report, with thermal imaging included, every accessible outlet tested and the air conditioning temperature split measured.

Schedule a Phase Inspection

Who It’s For

Buyers building a new home in North Texas who want an independent inspector working on their behalf, alongside the builder’s own process and municipal inspections.

Inspector documenting construction details

What You Receive

Helpful Resources

New-construction kitchen at the final inspection
Final (Phase 3) walkthrough of a new-construction kitchen
New-construction garage interior
New-construction garage at the final inspection